How we prepare a stainless steel work platform for installation
Before dispatch, we assemble every multi-section stainless steel work platform in full in our workshop. We check how the sections fit together and make any adjustments in-house. This keeps installation on site predictable and your plant project on schedule.

Trial assembly of the frame sections
We bolt the frame sections together during trial assembly. At each joint, we check that the bolt holes line up, the connection plates sit flush and the sections meet at the specified height. If a joint needs adjusting, we do it while the platform is assembled.



We weld the deck plates in the workshop
We weld the deck plates to their respective frames in our workshop. The frame sections can still be unbolted. The decks arrive on site already fitted to their frames, reducing the amount of welding needed there.
Do the stairs fit? Does the gate close?
During trial assembly, we fit stairs, guardrails and safety gates at their designated connection points. We check the transition from the stairs to the deck, align the guardrails and test each gate. If it rubs or the latch does not engage properly, we adjust it in the workshop.



100%
of platform connections checked during trial assembly.
We recheck each connection after any adjustment.
We dismantle the platform for transport
For transport, we remove the guardrails, gates and stairs and unbolt the frame sections. The deck plates stay on their frames. We label and pack the assemblies so the installation crew can identify each section and reassemble the platform at the checked connection points.

Every work platform is built to fit
Equipment, pipework and existing access points determine the dimensions and connections of each platform. We design the platform and divide it into sections accordingly. Trial assembly confirms the fit before dispatch, avoiding unplanned adjustments on site that can hold up other trades.